The Hook: Use this feature to track operational events such as Out of Order rooms, comp rooms, or renovations for reporting and historical reference.
Prerequisites:
- None.
The Steps:
- Navigate to Daily > Input IJ (or Import PMS).
- Locate the Daily Log link at the bottom of the Income Journal Summary box.
- Click the Add icon in the lower left corner.
- Select the Type of event (e.g., Comp Room, Out of Order, Renovation).
- Enter the Room Number and any relevant Comments.
- Click Save.
The Result Validation:
- Success: The entry appears on the Daily Log Report under Site Reports.
Comments
0 comments
Article is closed for comments.